We now have a new first floor bath!
Here’s a shot of the vanity with the faucets and spout:
A door might be nice. The finish carpenter is supposedly coming on Saturday and I may speak with him about it then. A door, trim, painting, a vent cover, soap dish, shelves, towel rack, and TP holder, and, possibly, sealing the grout and the first floor bath will be complete. Still a lot to do but we’re moving along.
Wow!!! Are you going to hang a mirror above the vanity? I can’t believe you tiled that part of the wall. I suppose the style now is to hang a framed mirror – it will look awesome!
The mirrors are an issue. We’d wanted the tile to go up to the top of the mirror (which is the way it’s mounted in the old bathroom). What I think is going to happen is that the tile guy is going to come back and redo that part of the bathroom tile.